More renovation updates!!  Now I get to share how the master bathroom is coming together.

 

Just to remind you, below are the plans the architect drew up, and here is a link to my personal inspiration for what I want it to look like.Screen Shot 2016-03-11 at 8.18.12 PM

So below is a picture taken from when you first enter the master bathroom from the bedroom. There are no walls up yet and you can see straight through to the future washer/ dryer area and hallway.

2016-02-11 13.05.17

Below is another shot taken looking at the new entrance to the stairs (through the wall studs). PS– check out all that insulation!  Woop woop!

2016-02-11 13.05.11

(Below is what the bathroom looks like from the hallway.  You can see the door leading into our bedroom.)

2016-02-11 12.59.15

Flash forward a few workdays, and this is what the crew accomplished!  Check out the framing for the shower!

2016-03-01 12.55.56

There’s a little half-wall between the shower and toilet, and another little half-wall between the toilet and sink area.

2016-03-01 12.56.06

Here’s a close-up of the arched shelf and little bench in the shower.  Eeek!

2016-03-01 12.55.33

And then!… flash forward a few more workdays and check out how it’s coming together with all the walls and tiling background put up!

2016-03-03 17.03.27

(And here is the view from the shower area looking toward the other side.  You can see a hole in the wall where the medicine cabinet is going to be installed!)2016-03-03 17.03.50

We have the plumbing and electricity in the walls, and even a little cubby for storing extra toilet paper in the half-wall.  I’m so excited for how it’s all coming together!!!

2016-03-03 17.03.43